after our meeting with Vicroads the temporary path promised has been delivered. This new path will allow cyclists who wish to keep off the roads to access the Waurn Ponds Creek Trail from the Barwon River Trail with a minimum of on road riding.
Posts By: peterj1944
Site preparation works have commenced for this new bridge; at meetings with Vic Roads we have been advised that the paths around the river will remain open throughout construction, if works impinge upon the path a temporary path must be laid around the works.
A new concrete path has been added to the river end of the new track which allows easy access from the river track on to the Criterium circuit.